Hoe Street – Groundworks and Concrete Frame

Complete groundworks and reinforced concrete frame delivered on an exceptionally restricted urban site, with all logistics managed in accordance with the Construction Logistics Plan.
Location
Walthamstow, London
Sector
Residential
Completion
2024
Package
Groundworks, reinforced concrete frame, drainage and external services
Package Value
< £1 million
Project Overview
ECS Group delivered the groundworks and reinforced concrete frame package for a new development on Hoe Street in Walthamstow. The works included substructure and superstructure concrete, retaining walls, underpinning, drainage and below-ground services.
Key Scope of Works
• Reinforced concrete substructure and frame • Retaining walls and associated foundations • Watertight concrete construction • Underpinning works • Foul and surface-water drainage • Below-ground service infrastructure • Cast-in masonry support systems • Off-site prefabrication of reinforcement cages
Project Delivery
The project was delivered on an exceptionally restricted site, with the reinforced concrete frame occupying virtually the entire available footprint. To overcome the limited working and storage space, reinforcement cages were prefabricated at ECS Group’s own facility and delivered to site ready for installation. ECS coordinated and managed the site logistics throughout, maintaining compliance with the Construction Logistics Plan while controlling deliveries, lifting operations, temporary works and safe access.