top of page
1522 High Road – Basement
Comprehensive basement excavation, reinforced concrete substructure and below-ground drainage package, including contiguous pile preparation, retaining walls, ground beams, slabs, attenuation and pumped drainage systems.
Location
Whetstone, North London
Sector
Residential
Completion
2025
Package
Basement excavation, reinforced concrete substructure and below-ground drainage
Package Value
< £1 million
Project Overview
ECS Group delivered the basement excavation, reinforced concrete substructure and below-ground drainage package for a new residential development in Whetstone. The works included approximately 1,000m³ of excavation and disposal, cropping 178 contiguous piles and constructing reinforced concrete capping beams, ground beams, retaining walls and ground-bearing slabs.
Key Scope of Works
• Basement and reduced-level excavation
• Cropping of 178 contiguous piles
• Reinforced concrete capping beams and ground beams
• Reinforced concrete walls and ground-bearing slabs
• Foul and surface-water drainage
• Two surface-water attenuation tanks
• Foul and surface-water pumping systems
Project Delivery
The package was delivered on a constrained site with restricted access and close interfaces between the piled structure, reinforced concrete works and drainage systems. ECS carefully sequenced the works to accommodate site-boundary restrictions, installed pile positions and the different development levels.

01
1522 High Road – Basement
bottom of page