WCCC Edgbaston Colts Ground - Groundworks
Groundworks, reinforced concrete raft slabs and foundations delivered for a new maintenance facility within Edgbaston Stadium.
Location
Birmingham
Sector
Sports and Stadia
Completion
2025
Package
Groundworks, reinforced concrete slabs, foundations and drainage
Package Value
< £1 million
Project Overview
ECS Group completed the groundworks and reinforced concrete package for a new maintenance facility within Edgbaston Stadium. The works included reduced-level excavation, disposal, compacted sub-base and construction of reinforced concrete raft and external slabs. The package also incorporated slab thickenings, trench foundations, concrete finishes, movement joints and gravel filter drainage.
Key Scope of Works
• Reduced-level and trench excavation
• Off-site disposal of excavated material
• Compacted Type 1 sub-base and membranes
• Reinforced concrete raft slab and thickenings
• Reinforced external concrete slab
• Reinforced concrete trench foundations
• Construction and movement joints
• Gravel filter drainage
• Relocation of fencing, containers and maintenance equipment
Project Delivery
The works were delivered within a live training facility over a concentrated programme of approximately four weeks. Careful coordination of access, material movements and working areas was required, including the relocation of fencing, containers and grounds-maintenance equipment. The groundworks, reinforcement and concrete pours were sequenced as a coordinated package to maintain progress within the restricted programme and minimise disruption to facility operations.

01
WCCC Edgbaston Colts Ground - Groundworks